Prilling Tower - Animal Feed Producer

JDI and our design/build partner provided construction assistance for a new 72,000 SF processing facility and a 60,000 SF two-level prilling tower with a connecting ramp after a fire destroyed the facility.

Both were designed and constructed within a compressed six-month schedule. The design/build team met this accelerated time frame using Building Information Modeling (BIM) software, allowing in-depth clash detection to avoid significant problems.

Construction began before the completion of the process layout to meet the schedule. However, using the model in both the design phase and in the field allowed changes to the structure and building envelope to accommodate the process until fabrication of foundations and structural framing occurred. Ongoing coordination throughout the construction window resulted in minimal field changes. Our project manager also provided specification and cross-discipline coordination of process equipment and plant process and environmental control systems.

Location


Painesville, OH

Markets


Food
Manufacturing

Services


Project Management
Structural
Civil
Surveying
Electrical
Architectural
Mechanical – Process
Mechanical – Facilities
Automation / Instrumentation / Controls

VIEW SIMILAR PROJECTS

Chemical Client

Chemical Client

Ann Arbor Schools

Ann Arbor Schools